Tile flooring installation can be a very rewarding and satisfying DIY project for homeowners. Even if this is your first time installing a tile floor, provided you have the right tools, materials, knowledge, and just the right amount of patience, your tile floor can look like it was done by a professional, but at a much, much lower cost! 

However, you also need to remember that mistakes made when installing tiles can be like a pimple on your forehead…even if other people do not notice it, you see it and feel everyone else sees it too. And mistakes when installing tiles can be hard to fix. 

So, take your time, follow this step-by-step guide carefully so mistakes can be avoided, and do not start a stage unless you have sufficient time to complete that stage.

Here’s a step-by-step guide to help you get started:

Table of Contents

SureReno Helpful Hints

  • Start with a clean, level sub-floor.
  • Take the time to carefully layout your tile project.
  • Measure twice, cut once.
  • Use a Tile Levelling System.
  • Clean as you go.

Step-by-Step Guide to Tile Flooring Installation

Prepare the Sub-floor

Ensure that the surface where you will be laying the tiles is clean, dry, and free of any debris. It should also be reasonably level. 

If your sub-floor is out of level, be sure to read our article: How to Level an Uneven Sub-floor in 10 Easy Steps: A DIY Guide.

Carefully Plan Your Tile Layout

Properly planning your floor tile layout is crucial for the overall success of your project. A well-thought-out layout ensures:

  • All Cut tiles are against a wall.
  • Grout lines are symmetrical to the room
  • Grout lines are far enough from the baseboard trim to avoid highlighting crooked walls.
  • The most visible areas receive additional consideration.

For a more detailed step-by-step guide on laying out your floor tile project, be sure to read: SureReno’s Guide – How to Layout Your Floor Tile Project.

Measure Twice, Cut Once

Once your tile layout is complete, measure your cuts and mark your starting lines. Try to cut as many tiles as possible before applying the thin-set cement to avoid being pressured to move quickly.

For Guidance on cutting Tiles, check out our article on: Top 10 DIY Tile Cutting Tips: Become A Tile Master.

Apply the Thin-set Cement

Spread the tile cement evenly on the substrate using a notched trowel, making sure to create grooves in the adhesive for better adhesion. Apply the adhesive to only a small area at a time, allowing you to effectively place the tiles.

For guidance on selecting the right thin-set cement and trowel, check out our article: SureReno’s Guide to Selecting & Applying Thin Set Mortar

tile flooring installation

Place the First Tile

Position the first tile carefully onto the thin-set mortar. Confirm that your tile is placed in accordance with your tile layout. Use a small level to ensure it is level in all directions.

Press down firmly to ensure it adheres well to the substrate. Re-confirm that it is properly positioned and level before proceeding to installing the next tile.

Use a Tile Levelling System

A tile leveling system is essential for any DIY tile floor project. Using a tile leveling system will help ensure the tops of the tiles are level and at the same height.

To learn how to use a tile levelling system, check out SureReno’s Guide to:  Installing Tiles Using A Tile Leveling System.

Tile Leveling System

Check Alignment Often

Verify that the tiles are properly aligned and level by checking with a spirit level or visually inspecting them. After each row of tile is laid, confirm you are still in line by checking your measurements to the center line.

Continue Laying Tiles

Repeat the process with the next tile, placing leveling clips under the edges as you progress. Make sure each tile is snug against the previous one and that the clips are positioned correctly.

Allow Thin-set Mortar to Fully Set

Let the adhesive or mortar set according to the manufacturer’s instructions before removing the leveling clips and wedges.

This typically takes anywhere from 24 to 72 hours, depending on the type of adhesive used and environmental conditions.

Remove Clips and Wedges

Once the adhesive is fully set, remove the leveling clips by kicking them off at an angle or using a rubber mallet to break them off. Be careful not to damage the tiles in the process.

Grout the Tiles

After removing the clips and wedges, fill the gaps between the tiles with grout using a grout float. Applying the grout at 45 degree angles to the seams will ensure your grout gets deep in the gaps.

Wipe off excess grout with a damp sponge. For guidance on Grouting your Tiles, check out our article: 8 Simple and Fail-Proof Steps to Grouting Tiles.

Finish

Allow the grout to cure as per the manufacturer’s instructions. Once dry, clean the tiles thoroughly using a cheesecloth to remove any remaining grout haze. Be sure to apply a sealer to the grout to protect it from stains and moisture.

For guidance on sealing and maintaining your new tile floor, check out our article: 7 Important Tips to Maintain Beautiful Tile Floors.

Conclusion

By following these steps and tips, you should be able to successfully complete your tile flooring installation as a DIY project. It may take some time and effort, but the results can be very satisfying!

Now that your tile flooring is installed, be sure to incorporate trims, transitions, and registers to make your DIY project stand out! For more details, check out our article on: Finishing Touches for Tile Flooring Projects

Once your project is done and you can enjoy your new floors, maintenance is as important to ensure its longevity and aesthetics, for more on that, check this link from our friend from WhyTile.com.

Happy Tiling!

Share this article:

 

Leave a Comment

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Scroll to Top